From a Bently Nevada 24701 Part Number to Installation Release: The Evidence Checklist Buyers Need Oct 28, 2026
MOORE AUTOMATIONTECHNICAL PROCUREMENT · EVIDENCE CHECKLIST

21000 / 24701 / 164818 · Buyer’s working guide

From a Bently Nevada 24701 Part Number to Installation Release: The Evidence Checklist Buyers Need

Define the supply boundary. Match the drawing. Give every unresolved item an owner.

ONE ORDER · FIVE EVIDENCE STEPS

  1. Complete order identity
  2. Written supply scope
  3. Drawing reconciliation
  4. Approval evidence
  5. Responsible release
Evergreen technical articlePublished: Sources checked: 28 October 2026

A complete housing part number is the beginning of a purchasing record, not the end of an installation decision. For 24701-00-00-15-037-04-02, the useful question is not simply “Can this housing be supplied?” It is “What will arrive, what must come from elsewhere, and what evidence will allow the site to release the installation?”

This guide turns that question into a working sheet. Purchasing can reconcile inclusions, the project manager can track missing records, and the responsible site engineers can identify what remains open before installation. Its starting point is a specific request to check this complete model against the manufacturer’s ordering information; it is not presented as a recurring failure, a customer incident or a search-trend finding.

01

Start with the complete order code and define the supply boundary

Keep the exact model on the enquiry, quotation, purchase order and receipt record. An abbreviated family reference makes it harder to identify which item a supplier has offered. Use the 24701-00-00-15-037-04-02 product reference to identify the enquiry line, then reconcile it against the original ordering table and the written offer.

MANUFACTURER DRAWING · FIGURE 2 EXCERPTBently Nevada original 24701/CA24701 housing drawing showing housing, mounting thread F, standoff C, penetration D, sleeve and probe
24701 / CA24701 structural reference. The depicted probe and arrangement do not establish the supply scope of this order or its installation approval.
View full original page →
Source: Baker Hughes, 141600 Rev. AC, Figure 2, p. 17. Drawing excerpt; original labels retained.
24701-00-00-15-037-04-02
A · 00Probe not requiredNo probe selected by this field.
B · 00Probe cable not requiredNo probe cable selected by this field.
C · 151.5 in standoff adapterOption C dimension; not 15 mm.
D · 0373.7 in nominal penetrationOption D dimension; not 37 mm.
E · 04One 3/4-14 NPT plug onlyCheck additional connection items separately.
F · 023/4-14 NPT mounting threadReconcile with the mating detail.
SUPPLY BOUNDARY · CONCEPTUAL CHECKHOUSING ORDERMEASUREMENT EQUIPMENT24701-00-00-15-037-04-02Probe · Cable · Other required itemsConfirm each item as included, reused, separately supplied or unresolved.RECONCILE
Conceptual illustration, not a product image or installation drawing. The two “00” selections leave the probe and probe cable unselected; identify how the required equipment will be provided.

Identify the ordered assembly

Ask the supplier to state the exact offered code, quantity, condition and included components on the quotation. Record any separately offered items on their own lines.

Identify the remaining measurement equipment

Decide whether the site will reuse existing equipment or purchase missing items. The housing order alone does not establish a complete measurement system.

A purchasing file should explicitly identify who supplies the probe, cable and any additional accessories. “Existing” is not a sufficient entry: add the part number, asset tag or document that identifies what will be reused. If a required item cannot yet be identified, keep an open action rather than silently treating it as included.

02

Build an order-to-drawing evidence matrix before approving the purchase

Use one sheet for each configuration and installation location. Start with these five checks, then record the supporting documents and named owners in the full worksheet. This is a proposed procurement control, not a manufacturer-issued inspection form.

01

Confirm the identity and supply scope

Match the full code to the quote and nameplate. Identify included, reused and separately purchased items.

Buyer · Supplier contact · Instrumentation engineer
02

Match the arrangement to the drawing

Check C/D dimensions, E fittings, F threads, support, routing and access against the controlled drawing.

Mechanical engineer · Drawing owner · Installation lead
03

Resolve the approval documents

Match the offered configuration and end-use location to the required certificates and installation documents.

Site hazardous-area / electrical authority
04

Confirm the commercial evidence

Record traceability, document availability, lead time, warranty and any written exceptions.

Buyer · Supplier contact
05

Close receipt and release actions

Match delivered identification to the accepted order. Keep the closure evidence and the site release decision.

Receiving inspector · Designated site authority
Open the complete evidence worksheet · 9 checks

You can edit the action cells in this browser. Changes are temporary; copy completed entries into your project records before leaving the page.

Suggested responsibility roles below must be replaced by the actual person assigned to each action.
Order field / requirement Quotation inclusion to confirm Corresponding document Unresolved question / closure evidence Confirmation owner
Complete identity24701-00-00-15-037-04-02 Exact offered code, quantity, condition and any deviation. Enquiry, quote line, purchase order and nameplate or identification record. Do all records refer to the same configuration? Record the supplier’s written correction if they do not. Buyer + supplier quotation contact.Assign name / due date / status.
A / B fieldsProbe and cable supply boundary Written inclusions and exclusions; separate lines for any additional equipment. Itemized quotation and existing probe/cable identification. Which items are reused, purchased separately or still unidentified? Link each answer to a record. Buyer + instrumentation engineer.Assign name / due date / status.
C / D dimensionsStandoff and penetration Offered dimensions and units, with deviations stated. Controlled installation drawing; manufacturer ordering table and Figure 2. Which drawing datums apply? Resolve reach, interference and access questions on the drawing. Mechanical engineer / drawing owner.Assign name / due date / status.
E fieldConnection accessories Plug and every separately required fitting, seal or adapter. Quotation bill of items and site connection detail. What is still required at each connection? Record the responsible supply party. Installation lead + buyer.Assign name / due date / status.
F fieldMounting interface Offered thread designation and mounting-related parts. Mating thread detail, controlled drawing and manufacturer drawing. Has the actual interface been checked? Attach the accepted drawing revision or engineering disposition. Mechanical engineer.Assign name / due date / status.
Support and routingInstallation arrangement Identify whether supports, routing items or site work are in scope. Installation layout and any support detail required by the design. Are support, routing and maintenance access actions closed? Identify evidence for each. Responsible site engineer.Assign name / due date / status.
Location and approvalsExact configuration and end-use country Requested approval documents identified by document number and scope. Area classification, applicable approval/certificate and relevant installation or control drawing. Does the evidence cover the offered identity and installation? Obtain a written site decision. Site hazardous-area / electrical authority.Assign name / due date / status.
Commercial documentsTraceability, delivery and warranty Available traceability, document scope, lead time and warranty terms. Written offer, agreed document schedule and purchase-order requirements. Which requirements are confirmed, qualified or unavailable? Resolve exceptions before acceptance. Buyer + supplier contact.Assign name / due date / status.
Receipt and releaseDelivered identity and site authorization Agreed delivery records and inspection documents. Receiving record, closed action list and site release record. Does the delivered item match the accepted offer? Identify who authorizes installation and subsequent return to service. Receiving inspector + designated site authority.Assign name / due date / status.

Attach the sheet to the exact-model enquiry reference, not just to a generic housing-family description. A useful reply should answer the open rows or identify what further information is required. A catalogue link is an identification aid; it is not closure evidence for an unresolved installation question.

03

Separate enclosure identification from installation approval

Three decisions need separate records. A matching code can support the identification decision while leaving the drawing or approval decision unresolved. This distinction helps the project manager see whether the next action belongs to purchasing, the supplier or the site engineering team.

IDENTITY

Is this the offered item?

Reconcile the model, quotation revision and delivered marking. Document substitutions before accepting them into the project file.

FIT

Does the arrangement match?

Ask the drawing owner to close dimensional, access, support and connection questions against the actual installation.

AUTHORIZATION

Who may release the work?

Have the designated site authority accept the applicable documents and record any restrictions or outstanding hold points.

Support: C + D above 300 mm (12 in) requires support near the probe. This code totals 5.2 in nominally; the actual layout still needs engineering review. [1, p. 7]

Approval: CA24701 CSA explosion-proof ratings depend on the specified options; CA housing orders are limited to North American end users. Stainless steel or an explosion-proof fitting alone does not certify an ordinary 24701 assembly. [1, pp. 4, 8]

Open actions: Assign an owner to each missing document or mismatch. Record the applicable document, site acceptance and any effect on procurement or outage planning before closing the action.

04

Send Moore Automation Limited a scoped enquiry

Send a purchasing package that distinguishes the requested assembly from the equipment and documents needed around it. Ask Moore Automation Limited to quote the specified code and list any alternatives separately, with differences and exclusions visible.

Include these records with the enquiry

  • Full part number, readable nameplate photographs, quantity and equipment tag.
  • Existing probe identification and the parts intended for reuse.
  • Installation drawing with revision, dimensional units and connection details.
  • End-use country, relevant location requirements and documents requested by the site.
  • The completed or partially completed evidence sheet, highlighting missing items.
  • Requested traceability, delivery date and destination, warranty terms and certification-document scope.

Ask the supplier to identify the quoted configuration, included items, exclusions, document availability and commercial terms in writing. Where a requirement cannot be confirmed, request an explicit exception and an action owner. Availability, lead time, warranty and certification documents must be established for the actual offer; they are not promised by the article.

Keep the supplier’s commercial response and the site’s technical acceptance as separate entries in the same package. For example, confirmation that an accessory can be supplied closes an availability question; it does not by itself close the drawing question about which accessory the site requires.

05

Record unresolved items, responsible parties and release evidence

Use the sheet as a live record through quotation review, purchasing, receipt and installation planning. Update it when a drawing changes, an alternative is proposed or delivered identification differs from the accepted offer.

01020304PurchaseReceiptInstallation releaseReturn to serviceAccepted scopeand open actionsDelivered identityand required recordsClosed evidenceand site authorizationSite verificationand handover
Suggested evidence sequence. Each gate retains its own records and responsible person.
  1. Before purchase approval: resolve supply exclusions, identify missing equipment and record the accepted configuration and document requirements. If a required answer is unavailable, record the hold or an authorized disposition.
  2. At receipt: reconcile the delivered identity and documents with the accepted order. Record discrepancies and their disposition before treating the item as ready for the intended work.
  3. Before installation release: have the designated site authority review closed actions, controlled drawings and required approval evidence. Name the person making the release decision and retain the record.
  4. Before return to service: follow the site’s installation, verification and handover process. Installation release and operational return-to-service authorization are distinct decisions.

The final package should let another reviewer trace each important decision without reconstructing it from emails. A closed row needs more than a check mark: retain the accepted answer, its supporting document and revision, the responsible person and the closure date.

Frequently asked questions

Can the housing quotation be treated as a complete measurement-system quotation?

No. Use the supply-boundary rows to identify everything required for the installation and which party supplies it. Confirm exclusions explicitly before approving the order.

What should happen if the quotation and installation drawing disagree?

Log the discrepancy with both document revisions, assign it to the drawing owner and supplier as appropriate, and record the accepted resolution. Do not resolve it by silently editing the purchase description.

Who should confirm hazardous-area suitability?

The site should identify the person authorized to accept that evidence. Purchasing should obtain the requested records and track exceptions; a supplier’s stock confirmation is not the site’s approval decision.

Can this worksheet be reused for 21000 or 164818 enquiries?

The evidence columns can be reused. Replace the model-specific entries with the correct ordering information and drawings for that item; do not copy the 24701 code interpretation into a different family.

What if a required certificate or drawing is not yet available?

Mark the row open, name the person who must obtain it and record the effect on the purchasing or installation decision. An unavailable document should not appear as a completed check.

Sources and related reading

[1] Baker Hughes / Bently Nevada: 21000, 24701, and 164818 Proximity Probe Housing Assemblies, 141600 Rev. AC. Ordering and approvals: pp. 4, 6–8; installation drawing: Figure 2, p. 17. Accessed 28 October 2026. The current file has 20 pages and a 2026 copyright notice; an exact publication date is not stated.

Related overview: Bently Nevada 21000/24701 Proximity Probe Housing Assembly and Practical Case. The page displays 23 January 2026, 09:37:49, with no timezone shown. This article adds the evidence worksheet and responsibility workflow; no case-benefit figures from that overview are adopted.

The workflow and worksheet are editorial procurement aids. Use the applicable controlled documents and the site’s designated engineering responsibilities for actual installation decisions.

24701-00-00-15-037-04-02 · SCOPED QUOTATION

Send the code. Attach the drawing. List what is missing.

Send your nameplate photographs, quantity, existing probe details, installation drawing and evidence worksheet to Moore Automation Limited.

नये उत्पाद
चलो एक साथ काम करो
एक महत्वपूर्ण ब्रेकडाउन में अटक स्थिति? मूर ऑटोमेशन दुनिया भर में ग्राहकों को एक असंख्य सेवाएं प्रदान करता है। पता लगाने के लिए आज हमसे संपर्क करें कैसे हमारी अनुभवी टीम आपको कम करने में मदद कर सकती है डाउनटाइम।
संपर्क करें

एक संदेश छोड़ें

एक संदेश छोड़ें
अगर आप हमारे उत्पादों में रुचि रखते हैं और अधिक जानकारी जानना चाहते हैं, कृपया यहां एक संदेश छोड़ दें, जैसे ही हम कर सकते हैं हम आपको जवाब देंगे।

घर

उत्पादों

whatsapp